WATERPROOF BATTERY CHARGERS 17
promariner.com
ProSportHD Series—Global Selection
Model Part #
ProSportHD 6
ProSportHD 12
ProSportHD 20
ProSportHD 20 Plus
44023
44026
44028
44029
DC Voltage Systems
12V
12V/24V
12V/24V
12V/24V/36V
Amps
6A
12A
20A
20A
No. of Batteries
1 Bank
2 Banks
2 Banks
3 Banks 6'/6'/6'
AC & DC Cable Length 6'
6'/6'
6'/6'
Size
7.9"x7.7"x2.9" 20.1 x 19.6 x 7.4cm
7.9"x11.3"x2.9" 20.1 x 28.7 x 7.4cm
7.9"x13.6"x2.9" 20.1 x 34.5 x 7.4cm
7.9"x13.6"x2.9" 20.1 x 34.5 x 7.4cm
Universal IEC c14 power cord
Weight
3.8 lbs
6.4 lbs
8.2 lbs
8.8 lbs
VAC / Max Amps
100–240V AC 50/60Hz / 2A
100–240V AC 50/60Hz / 3A
100–240V AC 50/60Hz / 5A
100–240V AC 50/60Hz / 5A
AC Plug
IEC c14
IEC c14
IEC c14
IEC c14
C13 Plug Adapters For ProSport HD Global Universal IEC C14 power cords. Available in country C13 plug adapters as shown (not included).
UK 90140
US 90100
Europe 90110
Australia 90130
Brazil 90170
Factory Set for Flooded/Lead-Acid Batteries Stage 1 - Analyze & System Check OK During this stage the ProSportHD Mode LED will pulse blue indicating it is analyzing all battery connections and ensuring each battery is capable of being charged. When completed successfully, the “System Check OK” indicator will illuminate green. This takes approximately 1 minute. Stage 2 - Charge During this stage the ProSportHD Mode LED will be solid red and the ProSportHD will use all of its available charging amps (as controlled by temperature) until the battery voltage is raised to the selected absorption voltage. Stage 3 - Condition During this stage the ProSportHD Mode LED will be solid amber. During this mode batteries will be held at the selected absorption voltage to complete charging while conditioning each battery connected for up to 3 hours as needed. Stage 4 - Auto-Maintain (Energy Saver Mode) During this stage the Mode indicator will be solid green, indicating it is monitoring and auto-maintaining your batteries as needed to maintain a full state of charge. At this time, the blue Power LED, green System OK and green Mode LEDs will remain on letting you know your batteries are ready when you are. Stage 5 - Storage Recondition During this stage the ProSportHD will enter into its once a month Storage Recondition mode. The green Mode LED will pulse indicating that while your batteries / boat are in storage, the ProSportHD is reconditioning all batteries for up to 3 hours once a month to extend battery life and provide maximum reserve power performance on the water.
5 Stage Performance Charging Overview
Flooded (Lead Acid) 14.6V DC Conditioning / AutoMaintain 13.4V DC AGM and HP AGM* 14.7V DC Conditioning / AutoMaintain 13.6V DC Gel 14.1V DC Conditioning / AutoMaintain 13.8V DC LiFePO4** 14.2V DC Conditioning / AutoMaintain 13.6V DC * HP (High Power) AGM with ProSportHD20 Dual only **Only charge approved LiFeP04 batteries. See manual or promariner.com/Li for approved LiFeP04 batteries and warnings
Related Products
Cable Extender page 43
Powered by FlippingBook